DPD-12 Steel Detachable Plate Diffuser

DPD-12 Steel Detachable Plate Diffuser
Steel

DPD-12 Steel Detachable Plate Diffuser

— Detachable plate design
— T-bar ceiling grid compatible

Specifications

MaterialSteel
MountingT-Bar Ceiling Grid
Business Terms
MOQ50 pcs (standard) · 200 pcs (custom spec)
SampleAvailable — ships within 3 days
Lead Time10-15 days (standard) · 25-35 days (custom)
PaymentT/T, PayPal, L/C · 30% deposit + 70% before shipment
ShippingFOB Ningbo · CIF / DDP available · confirm US stock and Houston production status
12h quote response|Ask for product documents|OEM available
Get a quote

Quote for DPD-12 Steel Detachable Plate Diffuser

We respond within 12 hours. MOQ as low as 100 pcs.

or WhatsApp: +86-137-3577-6586
More T-Bar
Technical guides

Learn more about t-bar

Drop Ceiling Diffuser Guide

2x2 lay-in neck CFM, 15/16 vs 9/16 grid fit and seismic support rules

HVAC Diffuser Types

T-bar compatible diffuser selection

Plenum Box Guide

Connecting T-bar diffusers to ductwork

FAQ · DPD-12 Steel Detachable Plate Diffuser

DPD-12 Steel Detachable Plate Diffuser — FAQ

What is the MOQ for DPD-12 Steel Detachable Plate Diffuser?▾

Standard catalog items: 100–500 pieces minimum. Custom specifications typically require 500–2,000 pieces. We stock 1 SKU variants. Contact us for a precise quote.

What is the lead time for DPD-12 Steel Detachable Plate Diffuser?▾

Standard items: 15–25 business days from China. Custom/OEM: 30–45 days. Houston production of galvanized ducts, spiral ducts and custom elbows is expected by December 2026; confirm availability and lead time.

Can I get custom specifications?▾

Yes — custom dimensions, materials (galvanised steel, aluminium, stainless steel), finishes (powder coat, anodised, raw), and packaging. Share your drawings and we quote within 12 hours.

What certifications does this product have?▾

UL certification has not been obtained. Other certificates vary by product line. Request documents for this exact model.

Do you ship to the United States?▾

Yes. We ship from China via ocean freight (FOB/CIF/DDP). Our Houston facility is expected to be ready for galvanized duct, spiral duct and custom elbow production by December 2026; confirm availability for US-made orders.

08 · The order desk

Ready to simplify your HVAC sourcing?

Send your parts list and get a consolidated quote within 12 hours.

Request a Quote — Free & FastChat on WhatsApp — Reply in 2 Hours
WhatsAppGet a Quote